Automotive Tier 1 Assembly Plant
Main ring network for supplying pneumatic robots and critical torque tools in the Bajío industrial corridor.
Data Sheet
Industry
Automotive Manufacturing
Location
Silao, Guanajuato
Robotic Assembly Line
Date
November 2023
The Client’s Profile
A “Tier 1” supplier company in the Silao industrial park, which manufactures chassis components for German and American brands. In these plants, a line stoppage costs thousands of dollars per minute.
The Prevost Solution
Replacement of carbon steel network with 80mm Aluminum Ring.
- Problem Solved: The old piping released rust that clogged the robots’ solenoid valves.
- Result: Prevost aluminum, being corrosion-free, eliminated valve maintenance shutdowns by 100%.